FLTEM Geophysical survey to commence

  1. 42.0k
    Posts

    VIC - Victory Mines to Commence FLTEM Geophysical Survey at Clara Hills

    Victory Mines announced that a Fixed Loop Transient Electromagnetic (FLTEM) geophysical survey will commence on 17 July 2013 at its Clara Hills project. The survey, which will take approximately one week to complete, will follow up on targets generated from the recently completed VTEM helicopter-borne geophysical survey which highlighted four strong VTEM anomalies and another three moderate anomalies. The anomalies have been field checked to allow the FLTEM survey to be properly designed, and once completed the survey will provide immediate drill targets. All anomalies (except Nos 6 and 7) will be covered by the FLTEM survey. The company will release the results of the FLTEM survey as soon as practicable.

Your browser is too old for TopStocks and not secure. Please update your browser